N2SF Deliverables and Security Review: What Should Organizations Prepare?
The National Network Security Framework (N2SF) connects risk identification and security control planning to security review by reflecting the results in key deliverables such as the project plan, RFP, network architecture, and self-developed security measures.
N2SF Deliverables and Security Review
What Should Organizations Prepare for an Information Project?
Government and public-sector IT environments are changing rapidly as cloud computing, generative AI, remote work, and other technologies become increasingly common.
This change also requires a shift in cybersecurity. Instead of relying only on network separation, organizations increasingly need to identify the importance of information and the threats surrounding each information service, and then apply appropriate security controls.
The National Network Security Framework (N2SF) is designed around this approach.
The September 2025 version 1.0 guideline describes N2SF as a security framework in which organizations identify business information and information systems, classify them into three levels—Classified (C), Sensitive (S), and Open (O)—and apply security controls according to their classification.
One of the most important practical aspects of N2SF is the relationship between deliverables and security review.
1. Why Are N2SF Deliverables Important?
N2SF is not simply a process for purchasing security products.
It follows five major stages:
Prepare → Categorize → Identify → Select → Assess
The guideline explains that the results produced at each stage affect subsequent activities and are ultimately reviewed and consolidated during the Assess stage.
Therefore, the final deliverables should be viewed as more than administrative documents.
They provide documented evidence of the security decisions made during the information-service design process.
In practical terms, they should answer one important question:
"Why was this particular security measure selected?"
2. The Five N2SF Stages
① Prepare
The organization first defines the scope of the project and analyzes its business functions.
Major activities include:
Establishing the N2SF implementation plan
Analyzing organizational business functions
Identifying business information
Identifying information systems
Identifying information services
Defining usage scenarios
Establishing basic security objectives
The goal is to understand what information is handled, where it is stored, how it moves, and which systems are involved.
② Categorize
Business information and information systems are classified into three security levels:
C — Classified
S — Sensitive
O — Open
The classification of business information is used as a basis for determining the classification of information systems.
If an information system handles information with different security levels, the guideline provides a principle for applying the highest applicable level to the system.
This classification becomes an important part of the final security deliverable.
3. Identify: Turning the Information Service into a Threat Model
The third stage identifies potential security threats.
N2SF uses a Location–Subject–Object modeling approach to simplify complex information-service environments.
The model helps organizations identify situations in which different security levels are mixed and determine where additional security controls may be necessary.
The resulting relationship can be summarized as:
Information-service model → Security classification → Threat → Security requirement
This relationship becomes the foundation for selecting security controls.
4. Select: Connecting Threats to Security Controls
Once threats have been identified, organizations derive security requirements and select appropriate controls.
The controls may be administrative, physical, or technical.
The guideline indicates that organizations should consider factors such as:
C/S/O priority considerations
Characteristics of the information service
Organizational security policies
Applicable regulations and guidelines
Technical environment
Implementation feasibility
Compatibility with existing systems
Organizations may also define additional security controls when the standard N2SF controls do not sufficiently address a particular requirement.
An implementation plan is then developed for each selected control.
This can include:
Target systems
Implementation method
Product acquisition or development
Operational requirements
Responsible personnel
Required resources
Implementation schedule
5. Assess: Reviewing the Results Before Security Review
The final N2SF stage is Assess.
The organization reviews the results of the previous stages and checks whether they are appropriate and logically connected.
For example:
Business information → C/S/O classification → Threat → Security requirement → Security control → Implementation plan
should form a consistent chain.
If an inappropriate result is identified, the relevant activity and affected subsequent activities may need to be performed again.
The guideline states that final confirmation is made after all assessment items are appropriate and the necessary preparations for the security review have been completed.
6. Four Key Documents for Security Review
The N2SF guideline identifies four major documents to be submitted for security review.
No. | Document | Role of N2SF Results |
|---|---|---|
1 | Project Plan | Security-control implementation details and plans |
2 | Request for Proposal (RFP) | Reflection of security requirements and controls |
3 | Network Architecture Diagram | Network structure incorporating security controls |
4 | Self-Developed Security Measures | Consolidated results of the N2SF process |
① Project Plan
The project plan should describe not only the project objectives and implementation schedule but also how the security controls identified through N2SF will actually be implemented.
② Request for Proposal
The RFP should translate N2SF-derived security requirements into requirements that vendors can implement.
For example, requirements related to authentication, network separation, access control, logging, or data protection should be reflected in the RFP when applicable.
③ Network Architecture Diagram
The network diagram should show how the selected security controls are incorporated into the actual architecture.
It should allow reviewers to understand, as appropriate:
Network zones
Information systems
Information services
External connections
Internal connections
Security-control locations
The guideline specifically states that the network structure should reflect the security controls derived through N2SF.
7. The Core Final Deliverable: Self-Developed Security Measures
The most important consolidated N2SF deliverable is the Self-Developed Security Measures document.
The guideline describes it as a final deliverable that consolidates the results of the five major N2SF activities and provides a dedicated format for it.
Its structure includes the following major sections.
① Information-Service Security Objectives
This section defines the basic security requirements applicable to the information service.
Examples may include network separation, restricting Internet access to necessary services, or preventing simultaneous connections between specific environments.
② C/S/O Classification
Business information and information systems are organized according to their security levels.
③ Security Requirements and Security Controls
This section connects:
Threat location → Security requirement → Security control
The N2SF catalog can be used, and organization-specific controls can be added when necessary.
④ Security-Control Implementation Plan
The organization describes how each selected control will actually be implemented and operated.
The guideline's example includes:
Security-control item
Target
Implementation method
Implementation and operational requirements
Notes
Therefore, simply stating "MFA will be implemented" is generally less informative than documenting where, how, under what conditions, and how the control will be operated.
8. Consistency Across the Deliverables Is Critical
One of the most important practical points is that the four documents should not be prepared independently.
They should represent different views of the same security design.
A useful relationship is:
Business information
↓
C/S/O classification
↓
Information system
↓
Threat identification
↓
Security requirements
↓
Security controls
↓
Implementation plan
↓
Network architecture
↓
Project Plan / RFP
↓
Self-Developed Security Measures
If these documents contain contradictory information, additional clarification or revision may be necessary during the review process.
9. Practical Points to Check
1. Document the basis for C/S/O classification
The classification should be explainable based on the information being handled and the applicable criteria.
2. Connect threats to controls
A logical sequence is:
Threat → Security requirement → Security control
rather than selecting controls first and trying to justify them afterward.
3. Make the architecture consistent with the security measures
If the self-developed security measures require network separation, the architecture diagram should show how that separation is actually implemented.
4. Reflect security requirements in the RFP
Security requirements should not exist only in an internal security document. When relevant, they should also be reflected in procurement and implementation requirements.
5. Reassess changes
Changes to systems, network architecture, or information flows can affect previously identified threats and security controls.
The N2SF guideline also states that when an information-service model is modified or expanded, affected threat-identification and security-control activities should be considered again.
10. N2SF Implementation in 2026
N2SF has moved beyond the initial guideline stage into broader practical adoption.
In 2026, the Korea Internet & Security Agency (KISA) launched an N2SF adoption support program for government and public-sector organizations. The program includes activities such as identifying N2SF targets, C/S/O classification, adjustment of assessment results, and operational planning.
KISA also published the N2SF Demonstration Casebook in April 2026. The casebook was developed from demonstrations conducted in government and public-sector environments and emphasizes that organizations should redesign the models according to their own network architecture, connected systems, and security policies.
In addition, current national information-security guidance specifies four major documents for security review—project plan, RFP, network architecture diagram, and self-developed security measures—and the 2026 revision specifies that N2SF, cloud, and AI-related projects should include applicable guideline checklists and deliverables.
This means N2SF deliverables are becoming an increasingly important part of planning and documenting security requirements for public-sector information projects.
11. N2SF Deliverable Preparation at a Glance
Step 1 — Define project scope
→ Analyze business functions
Step 2 — Identify business information and systems
→ Determine what is processed and where
Step 3 — Classify C/S/O
→ Determine information and system security levels
Step 4 — Model the information service
→ Analyze Location–Subject–Object relationships
Step 5 — Identify threats
→ Determine threats and affected locations
Step 6 — Derive security requirements
→ Define requirements for identified threats
Step 7 — Select security controls
→ Select N2SF or organization-specific controls
Step 8 — Develop implementation plans
→ Define implementation, operation, responsibility, and schedule
Step 9 — Assess and adjust
→ Review and correct the results
Step 10 — Prepare the final deliverable
→ Complete the Self-Developed Security Measures
Step 11 — Reflect the controls in project documents
→ Project Plan, RFP, and Network Architecture
Step 12 — Prepare for security review
→ Check consistency across all four documents
Conclusion
The core idea of N2SF is not simply to replace one network-security model with another.
Its central approach is to identify the importance of information, analyze the threats surrounding the information service, and apply security controls appropriate to the identified risks.
The results must then be documented.
For an information project subject to security review, the Project Plan, RFP, Network Architecture Diagram, and Self-Developed Security Measures should therefore be treated not as independent documents, but as interconnected representations of one security design.
A strong N2SF deliverable should be able to explain a consistent chain:
What information is being handled → What threats exist → What security requirements are needed → What controls were selected → How those controls will be implemented and operated.
That consistency is one of the most important principles when preparing N2SF deliverables and security-review documentation.